“Energotechnika” LLC was found as a result of the allocation of the tender department and the department of turbine and boiling equipment  from the JSC “Gubernsky Gorod” joint business.

Customer Project/Object Equipment Participation
JSC “Gubernsky gorod” in the project
Installed capacity Year
FSUC “Perm Plant
named SM Kirov “, Perm
Power Plant  Steam turbine П-6-3,4/1,0-1 Complete delivery 6 MW. 2000
 JSC «Permenergo», Perm  Power Plant  details of the pipeline Complete delivery    2000
 Ltd. «Soda», Berezniki  Power Plant  To the boiler drum  Complete delivery   2001
 JSC «ZBK – 4», Berezniki  Steam Boiler  2 steam boiler КПЖ – 4  EPC Contract  8 tons
steam/hour
2001
 JSC «Magnesium Plant», Solikamsk  The project is not implemented  Comparison of gas-turbine and piston technology  Engineering  50 МW 2002
 JSC «Chepetsky Mechanical Plant», Glasov.  Power Plant  details of the pipeline  Complete delivery 2002
 Kollege № 52, Orenburg  Boiler House   water heating boiler   Complete delivery  1,25 МW  2002
 JSC «Soda Plant», Berezniki  Steam Boiler  details of the pipeline  Complete delivery   2002
JSC «Soda Plant», Berezniki  Steam Boiler  3 steam boiler БЭМ 25/1,6-310  EPC Contract   75 tons
steam/hour
2002
JSC «Henkel-Pemos», Perm Steam Boiler      2 steam boiler КПЖ – 10 EPC Contract 20 tons
steam/hour
2004
JSC «Lukoil», Perm The project is not implemented 2 gas turbine СТ35 Alstom, steam boiler 25-4,0/440, steam turbine П-6-3,4/05-1 Engineering 46 MW 2004
JSC «Chepetsky Mechanical Plant», Glasov Power Plant gas turbine GT 10B Alstom Engineering.Job agent 50 MW 2004
JSC «Uralkaly» Power Plant, mining camp 4 4 gas turbine SGT 400 (Siemens),4 recovery boiler КГТ 24/1,3-250 Engineering.Agent of Siemens.Complete delivery RB   51,6 MW, 96 tons
steam/hour
 2004 -2006
JSC «Uralkaly» Power Plant, mining camp 2, 3.The project is not implemented gas turbine SGT 400 (Siemens),recovery boiler 50 tons steam/hour1 steam turbine ПТ 12/3,4-1,0/1 Engineering  51,8 MW  2006
JSC «Steel Plant», Magnitogorsk The project is not implemented 4 gas turbine SGT 800 (Siemens),4 recovery boiler КГТ 58/15 – 7,5/0,65,2 steam turbine SST -РАС 400,
2 steam boiler Е-160/4,0- 440
Engineering  255 MW, 320 tons
steam/hour 
 2005
 JSC «EAF Plant», Cheliabinsk  The project is not implemented 4 gas turbine SGT 800 (Siemens),4 recovery boiler КГТ58/7,0-1,6/510-250,2 steam turbine SST -РАС 400 (Siemens)   Engineering  255 MW 2006 
 JSC «Lukoil», Perm  Installation of bitumen production 1 recovery boiler Г 480 ПЭ,chemical water treatment  Engineering.Complete delivery.Supervision.   10 tons
steam/hour
 2006
 JSC «Steel Plant», Chusovoy  Power Plant  Details of recovery boiler КУ – 80  Complete delivery 17 tons
steam/hour 
 2006
JSC «TGK – 9», Perm Power Plant № 9 Details of the pipeline Complete delivery   2007
 JSC «Azot», Moskow Replacement of compressor drive   steam turbine SST 600 (Siemens)  Agent of Siemens 10,5 MW  2007 
 JSC «Polymer Plant», Angarsk  Replacement of compressor drive   steam turbine SST 600 (Siemens) Agent of Siemens  30 MW  2007 
 JSC «Salavatnefteorgsyntes» Reconstruction works of compressor station steam turbine SST 600 (Siemens)  Agent of Siemens  28 MW  2007
JSC «TGK – 9», Perm Power Plant № 6 2 gas turbine SGT 800 (Siemens),2 exhaust-heat boilers HRSG (Siemens),2 steam turbine SST 600 Agent of Siemens  110 MW 2008
JSC «TGK – 9», Perm Power Plant № 6 steam boiler Е-160-1,4-250 ГМ,auxiliary equipment, valves Agent of Siemens  160 tons
steam/hour
2007-2009
JSC «Lukoil», Perm Details of recovery boiler ПКС-Ц-10/40 Complete delivery 2009
JSC «Stroytransgas» Power Plant steam turbine SST 800 (Siemens) Complete delivery 78,6 MW 2010
JSC «Caspian Pipeline Consortium» Compressor station 11 gas turbine SGT 100 (Siemens) Agent of Siemens 49,5 MW 2010
JSC «Yugo-Zapadnaja PP», St. Peterburg  

Power Plant

rebuilding

steam turbine SST 600  Agent of Siemens  106,4 MW  2011 
JSC «ТNКВР Holding», PP «Verhnechonskneftegas» Power Plant  gas turbine SGT 400   Agent of Siemens 12,9 MW  2011 
 JSC «Kamteks-Chimprom», Perm  Power Plant, rebuilding steam turbine Т  SST 110  Agent of Siemens   5 MW 2012
 JSC «Quadra» (ТГК-4), PP Aleksinskaja Power Plant, rebuilding  steam turbine SST PAC 400  Agent of Siemens   38,5 MW 2012 
JSC «Quadra» (ТГК-4), PP Diagilevskaja   Power Plant, rebuilding  steam turbine SST PAC 400 Agent of Siemens   38,5 MW 2012 
JSC «Quadra» (ТГК-4), PP Kurskaja 1  Power Plant, rebuilding   steam turbine SST PAC 400  Agent of Siemens 38,2 MW  2012 
 JSC «Bashkir Generation Company», PP Ufimskaja 2  Power Plant, rebuilding steam turbine SST 300  Agent of Siemens  14,0 MW   2012
SC “Satkinsky Iron-smelting factory” Power Plant, rebuilding steam turbine SST – 060 Engineering 1,8 MW 2015
 JSC “Shadrinskiy Automobile Units Plant” (LLC “UGMK – Holding”)* Power Plant, rebuilding  steam turbine SST – 060  Agent of Siemens  5,0 MW 2015

* –  the project is at the stage of conclusion of a contract 

Total  14 ST total capacity 416,5 MW.

Total  23 GT total capacity 284,6 MW.

Total  37 turbines total capacity 701,1 MW.

Total Boilers total capacity  340 GKl/ hours.